It's been a LONG winter and the wait for
professional expertise
has been almost unbearable, BUT......
the drain cover is set, the heater was finally installed along with a propane
light fixture
for those occasional electrical outages we experience in the winter,
the final layer of concrete was poured with a smooth finish and sealer applied.
Next up - demolition of the wall............
(Click on images for larger view)
![]() |
![]() Drain Cover |
![]() |
|
![]() |
![]() |
![]() |
![]() |
|
Propane Heater and propane light fixture (light will be enclosed with hardware cloth to protect it from potential "thrown objects") |
|||
![]() |
![]() |
||
| Smooth second layer of concrete flooring | |||